TOTAL FLOW (Cum) |
|
5,88,957 |
5,08,690 |
4,85,329 |
AVERAGE FLOW - Cum/day |
|
1,614 |
1,394 |
1,330 |
BOD (tonnes) |
IN |
1,014 |
1,545 |
1,100 |
OUT |
BDL |
BDL |
BDL |
Removed |
1,014 |
1,545 |
1,100 |
Suspended Solids (tonnes) |
IN |
1,855 |
2,153 |
1,767 |
OUT |
BDL |
BDL |
BDL |
Removed |
1,855 |
2,153 |
1,767 |
AverageBOD 27C(mg/l) |
IN |
1,721 |
3,040 |
2,266 |
OUT |
BDL |
BDL |
BDL |
Average SS(mg/l) |
IN |
3,149 |
4,236 |
3,640 |
OUT |
BDL |
BDL |
BDL |
SLUDGE PRODUCED |
Dry tonnes/annum |
4,317 |
4,524 |
5,825 |
Dry tonnes/cum |
0.0073 |
0.0089 |
0.012 |
SALT PRODUCED |
Dry tonnes/annum |
2973.47 |
1751.09 |
- |
Dry tonnes/cum |
0.0050 |
0.0035 |
- |
EFFECTIVENESS MEASURES |
Flow Treated |
100% |
100% |
100% |
BOD Removed |
100% |
100% |
100% |
SS Removed |
100% |
100% |
100% |
EFFICIENCY MEASURES |
Power Consumption (kWh) |
49,67,515 |
36,81,546 |
16,24,911 |
Power Consumed (kWh)Per m3 treated |
8.43 |
7.24 |
3.35 |
Power Consumed (kWh)Per tonne of BOD Removed |
4,898 |
2,382 |
1,477 |
Operating man -hours per m3 treated |
0.058 |
0.063 |
0.061 |
Total Plant man -hours per m3 treated |
2.15 |
1.97 |
2.03 |
ECONOMY MEASURES |
Plant Operating Cost (Rs) |
14,30,08,000 |
10,78,38,000 |
5,06,49,000 |
Total Capital Cost(Rs) |
28,27,30,006 |
26,42,97,097 |
25,48,61,009 |
Plant Operating Cost per m3 treated (Rs) |
243 |
212 |
104 |
Total Capital Cost per m3 treated (Rs) |
480 |
520 |
525 |