Upgradation of RANITEC CETP Under IFLADP Scheme

Item No Name of the item
I Pre-Treatment, Collection & Conveyance
1 Removing and re-laying of Gravity and Pressure manhole in RCC
2 Laying of Ductile Iron conveyance line for transfer of Recovered Water from CETP to Member Tanneries.
3 Installation of wireless monitoring system for all member tannery flow meter and TDS meter including cloud server.
II Primary, Secondary & Tertiary Treatment
4 Conversion of receiving sump pump house in to filtrate effluent collection sump.
5 Construction of Additional Equalization 3000 KL Tank.
6 Control of odour in the Equalization Tank and Receiving Sump and installation of Vacuum Swing Adsorption (VSA) for generation of pure oxygen.
7 Up-gradation of Filter press feed pump with energy efficient pumps
8 Reduction of Hydrogen Sulphide in the Pre-Aeration Tank by using Original Hydrodynamic Reaction (OHR) Aerator.
9 Improvement of blower efficiency in Aeration Tank – I & II.
10 Conversion of MS Primary Clarifier, Secondary Clarifier & Re-Activated Clarifier Mechanisms with scrapper in to SS 316 L
11 Installation of Air Operating Diaphragm pump for chemical dosing
12 Extension of PCC (Power Control Centre) panel with building.
13 Sludge extraction pump with Lorry and Tractor Trailer
14 Construction of Approach road to Nitrification & De- nitrification tanks, Multiple Effect Evaporator, Secure Landfill System, Wood Storage Platform, Sludge drying platform and shed within the CETP plant.
15 Construction of cable trench in RCC and cable tray ladder type and supporting in SS304 including laying of armoures HT/LT XLPE cables.
16 Construction of Centralised Control and Monitoring Centre.
17 Centrifuge for dewatering of Aeration Tank Bio Sludge - 2nos.
III RO & Evaporator
18 Improvement of PES UF membrane in to PVDF/Ceramic membrane to reduce backwash process.
19 Installation of 600 KLD RO followed by NF.
20 Construction of De-Nitrification Tank and Nitrification Tank and Fine Screen (250 m3/h).
21 Installation of 800 KLD Multiple Effective Evaporator with Boiler and ATFD.
22 Installation of Ammonia Removal plant by using Hydrophobic membrane for Evaporator condensate water.
23 Installation of Flue Gas Analyzer for Boiler.
24 Construction of Wood storage platform.
IV Secure Land Fill System
25 Construction of paddle dryer shed, Sludge storage platform etc., (sludge storage platform and shed, paddle dryer (1 No) and other mechanical items (Tipper lorry 1 number only) for handling of CETP sludge)
V Alternate power
26 Installation of 4MW Solar Energy @ 4.5crore per MW with an output of 1.8 Million units (AC) per annum per MW (7.2 Million units per year).
27 Installation of 1 ton/hr Solar Steam Generation